Date of Publication 11 Nov 2025
Title Tender for Manufacturing of Stainless Steel Folding Tool Cabinet
Category Civil Works; Construction; Engineering Services
Deadline 30 Nov 2025
Source casemo

Specification – Tender for Stainless Steel Tool Cabinet

  1. Project Title

Manufacture of a Foldable Stainless Steel Tool Cabinet

  1. Project Objective

The purpose of this tender is to award the serial production of a high-quality foldable tool cabinet made of stainless steel 1.4301 (V2A) to a qualified metal fabrication company located in Europe or an associated region (preferably the Republic of Moldova or neighboring countries). The supplier shall carry out complete manufacturing, assembly, and packaging.

  1. Product Description

The cabinet is a robust, portable tool and storage cabinet made of stainless steel 1.4301 (V2A) featuring a foldable body construction, triple locking system, and an electronic combination lock. It is intended for industrial and mobile applications.

Main Features

Material: Stainless Steel 1.4301 (V2A)

Sheet thickness: approx. 2–3 mm

Surface: Brushed finish (irregular pattern from deburring machine)

Dimensions (approx.): 865 × 715 × 770 mm

Construction: Foldable main body with wing screws

Door: Overlapping, triple-lock mechanism with electronic code lock

Adjustable intermediate shelf

Six robust inward-folding pin hinges

Protected cable entries on top and bottom

Grip profile for safe transport

Transport safety bracket

  1. Scope of Supply and Services

The contractor is responsible for complete technical implementation based on the provided construction drawings (PDF / DXF).

Tasks Include

Material procurement according to specification (1.4301 V2A)

Cutting, bending, welding, and deburring of all components

Surface finishing (brushing / deburring per sample)

Assembly including hinges, lock, wing screws, handles

Functional testing (locking system, folding mechanism, fit)

Packaging and shipment preparation (export packaging, palletizing)

Optional delivery CIF Hamburg or DAP Hamburg

  1. Quality Requirements

Dimensional tolerances: ISO 2768-mK

Welded structures: EN ISO 13920-BF

Thermal-cut tolerances: EN ISO 9013-IA

Visual inspection for dimensional accuracy, surface, and functionality

Electronic lock must be CE-compliant / OEM-compatible

Mandatory Certification: Supplier must hold a valid ISO 9001:2015 certificate. → A copy of the certificate must be submitted with the quotation.

  1. Quantities / Variants

Series 1: Pilot batch – 10 units

Series 2: Main production – 50 to 100 units per year

Packaging unit: 1 unit per box or pallet

  1. Delivery Time / Production Schedule

Pilot batch: Delivery within 8 weeks after order confirmation

Main series: 10–12 weeks after pilot approval

Option for a 12-month framework agreement

  1. Quotation Requirements

Quotations must include:

Unit price EXW (ex-works)

Optional price CIF Hamburg or DAP Hamburg

Delivery time after order confirmation

Payment terms

Mandatory copy of valid ISO 9001 certificate

References / sample projects for similar metal fabrication

  1. Communication and Documentation

Full technical drawings (PDF / DXF) will be provided to shortlisted suppliers. Communication language: English or German

For quotes and general inquiries, email vertrieb@casemo.de